![](https://legacy.angelswing.io/wp-content/themes/angleswing/images/icon/ic-quote.png)
Increasing productivity for mining and aggregate job sites
starts from frequent and accurate surveys
Detailed Use Cases
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/010-ruler-1.png)
Effectively and accurately calculate stockpile volumes at mining sites
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/004-analytics.png)
Manage construction aggregates inventory
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/007-analysis.png)
Monitor stockpile volume changes over time at mining and aggregate sites
Before
![](https://legacy.angelswing.io/wp-content/uploads/2021/01/광산골재-before.jpg)
-
Difficult to monitor mining and aggregate job sites at a glance
-
Difficult to make accurate and cost effective calculation of the mined amounts with visual surveys and outsourced surveys
-
Inaccurate calculations of the total mined amounts
-
Time consuming financial audit, inventory investigation, and reporting
After
![](https://legacy.angelswing.io/wp-content/uploads/2021/01/3.png)
-
Efficient inventory management with more accurate and frequent surveys based on dates
-
Cost effective and accurate calculation of the mined amounts and progress tracking
-
Calculate labor costs based on the completed mining amounts
-
Dramatically reduce surveying and reporting time during financial audits.
Detailed Use Cases
Stockpile Volume Calculation (AJU Corporation’s Aggregate Site in Paju)
![](https://legacy.angelswing.io/wp-content/uploads/2021/01/s01.png)
Monitor the Stockpile Volume Change (AJU Corporation’s Aggregate Site in Paju)
![](https://legacy.angelswing.io/wp-content/uploads/2021/01/s04.png)