![](https://legacy.angelswing.io/wp-content/themes/angleswing/images/icon/ic-quote.png)
Understanding the current status and
making quick accurate decisions is important
to complete construction projects on time.
Detailed Use Cases
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/006-planning.png)
Develop dump truck operation plan based on the cut and fill volume
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/004-analytics.png)
Optimize equipment planning and management based on road width and slope
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/004-vision.png)
Calculate materials amount based on job site area
Before
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/7-6-before.jpg)
-
Cumbersome job site survey for simple length, width, and area measurements
-
Difficult to persuade stakeholders of the need to modify existing plans due to the lack of quantified evidence
After
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/작업-계획.png)
-
Easy and accurate to measure length, width, and area with just a few clicks (average error is less than 3cm for x, y, and 5cm for z)
-
Use the latest on-site data as evidence to quickly update and explain the plan to stakeholders