![](https://legacy.angelswing.io/wp-content/themes/angleswing/images/icon/ic-quote.png)
Minimize design errors and
ensure accurate budget estimation
with up-to-date on-site data
Detailed Use Cases
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/012-money-bag.png)
Accurate budget estimation based on up-to-date on-site data
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/011-cad.png)
BIM design creation based on on-site 3D models
![](https://legacy.angelswing.io/wp-content/uploads/2021/02/005-analytics.png)
Review BIM design adequacy by comparing with on-site 3D models
Before
![](https://legacy.angelswing.io/wp-content/uploads/2021/01/7-1-before.jpg)
-
Surveying before procurement is difficult due to high cost.
-
Design changes occur frequently during construction due to failure to accurately reflect the latest status.
After
![](https://legacy.angelswing.io/wp-content/uploads/2021/01/7-1-after.png)
-
Surveying accurately with minimum cost and calculating accurate budget estimation for competitive bidding.
-
Prevent design errors and improve BIM model viability by planning/designing with actual on-site models.